Energy Management
An-Shin established a systematic Energy Management System and set up an "Energy Task Force" to review the planning and improvement of the management plan based on energy goals and scope of responsibility, as well as ensure the scheduled progress and the operation are in line with the requirements. To ensure the implementation of ISO 50001 energy management system, we updated the audit and inspection on December 8, 2020.
The purpose of Minsheng Store to obtain the ISO 50001 certification isto become a model store for the implementation of the energy management system, and all stores are required to follow the same standard as Minsheng Store to efficiently manage energy use and reduce greenhouse gas emissions, ultimately achieve the goal of energy saving and carbon reduction. 13 SOPs and documents were revised in 2020 and An-Shin took the preventative measures to identify 14 internal and external environmental issues. After risk assessment, 1 issue with a potentially large impact was addressed in the 2020 energy-saving action plan and the status and effectiveness will be tracked regularly.
Energy Resources and Greenhouse Gas Management
The total power used by An-shin in 2020 is 41,348,775 kW, with NT$ 5,281,241 thousand of non-consolidated revenue, 7.83 kW /thousand NTD of sales intensity.
Item | Unit | 2018 | 2019 | 2020 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power | kW (kilowatt) | 39,134,926 | 40,242,150 | 41,348,775 | ||||||||||||
Secondary energy | Million joules (MJ) | 140,885,734 | 144,871,740 | 148,855,590 | ||||||||||||
Product intensity | MJ/production | 1.37 | 1.42 | 1.55 | ||||||||||||
Service intensity | MJ/total amount of service delivered | 3.98 | 4.06 | 4.43 | ||||||||||||
Sales intensity | kW/thousand NTD | 7.57 | 7.45 | 7.83 | ||||||||||||
Electricity intensity | kW/number of stores | 147,679 | 146,335 | 144,072 | ||||||||||||
Electricity intensity | kW /m2 | 749 | 781 | 767 | ||||||||||||
Scope 2 greenhouse gas emissions | tons of CO2e | 20,859 | 20,483 | 21,047 | ||||||||||||
Greenhouse gas emissions intensity | tons of CO2e/revenue in thousands | 0.0040 | 0.0038 | 0.0040 |
Energy Saving Action Plan
An-Shin aims to double the energy efficiency of stores and headquarters. We try our best to quantify all the performance requirements achieve the goals through the improvement of energy saving action plans. The lighting and air-conditioning energy consumption in 287 stores (as of 2020) accounts for more than 50% of the total electric-ity. Besides, we gradually replaced the existing fixtures to LED light fixtures which are more energy efficient, including the LED sign boards. For the newly open stores, we use environmentally friendly building materials and energy saving lamps, air-conditioners, and other equipment. We also replace the air-conditioners in existing stores regularly, a total of 267 air-conditioners (indoor and outdoor) were replaced so far to ensure the energy efficiency and achieve the goal of energy saving and carbon reduction.
Item | Unit | 2018 | 2019 | 2020 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Air conditioner (indoor and outdoor) | Pieces | 273 | 290 | 267 | |||||||||||||
Estimated energy savings | kilowatts | 1,024,132 | 1,088,080 | 1,001,980 | |||||||||||||
Estimated secondary energy savings | million joules | 3,686,875 | 3,917,088 | 3,607,128 | |||||||||||||
Carbon emission reduction | tons of CO2e | 546 | 554 | 510 |
Improvement Project of Air Quality in Stores
An-Shin surpasses the standards to reduce the unpleasant odors in stores which may affect the living quality of the neighborhood. In 2020, we introduced at least 2 commercial range hoods (including traditional range hood and electrostatic precipitator) in stores located in New Taipei City to improve the dining environment. Besides, the Environmental Protection Department of the Executive Yuan announced the "Management Regulations for Facilities to Control Air Pollution from Commercial Cooking Operation" (draft) on September 10th, which is scheduled to be implemented in the end of the year. An-Shin will continue our efforts on improving air quality and contribute to the environmental protection.